FYI - was up at the landslide on the weekend.
1. There is no possibility to build a new road - the mountains dictate that.
2. Work continues to create a path through and the answer is the same "two or three weeks" that was given right after the slide.
3. Lots of discussions re opening the pass via Shatili, but have my concerns about that.
4. This is not about lack of effort - as the pictures show, the landslide was a biggie.
|