We've got all the scoots. After an overhaul, mine is ready to roll -I did a trip in 2006 and got everything prepped.
The two other guys has bought theirs. One is awaiting delivery of an engine which needs overhauling. The other guy has just given his a lick of paint and is in the process of putting it all together. Both of them need to equip the scoots and are awaiting delivery for parts.
Besides that, we are just about finished compiling a list of spares and consumables that we will order soon - hopefully by the end of the month. It is important to get this out of the way soon as some parts may be out of stock or difficult to source in a short notice.
We have compiled a list of tools and just need to gather them and lock them up so they are not lost. We've got a list of medical stuff that needs to be purchased and the vaccinations gotten out of our way. Probably during this summer.
As for riding equipment, camping equipment and clothing, we can do with what we have, but we will be replacing some of it - hopefully someone will sponsor us.
If everything goes as planned, we will have a test trip by the end of summer and do final adjustments. Again, it is important to get this done early as some mods or part sourcing may take time.
All of this stuff is pretty easy and straight forward if one has done it before.
The difficult bits are: - Transport of scoots in and out
- Funding and sponsorships. We will be able to pay for this ourselves, but are working on getting sponsorships where we can. it is tedious work with a very low success rate and low pay-out. There are a lot of companies that want to part with stuff you really don't need or want. Parting with money is an entirely different matter.
how are you guys doing?
|